{"@context":{"@vocab":"https://cir.nii.ac.jp/schema/1.0/","rdfs":"http://www.w3.org/2000/01/rdf-schema#","dc":"http://purl.org/dc/elements/1.1/","dcterms":"http://purl.org/dc/terms/","foaf":"http://xmlns.com/foaf/0.1/","prism":"http://prismstandard.org/namespaces/basic/2.0/","cinii":"http://ci.nii.ac.jp/ns/1.0/","datacite":"https://schema.datacite.org/meta/kernel-4/","ndl":"http://ndl.go.jp/dcndl/terms/","jpcoar":"https://github.com/JPCOAR/schema/blob/master/2.0/"},"@id":"https://cir.nii.ac.jp/crid/1390001205354586752.json","@type":"Article","productIdentifier":[{"identifier":{"@type":"DOI","@value":"10.2208/jscejcm.71.i_235"}},{"identifier":{"@type":"NDL_BIB_ID","@value":"027121177"}},{"identifier":{"@type":"URI","@value":"http://id.ndl.go.jp/bib/027121177"}},{"identifier":{"@type":"URI","@value":"https://ndlsearch.ndl.go.jp/books/R000000004-I027121177"}},{"identifier":{"@type":"URI","@value":"https://www.jstage.jst.go.jp/article/jscejcm/71/4/71_I_235/_pdf"}},{"identifier":{"@type":"NAID","@value":"130005142658"}}],"dc:title":[{"@language":"ja","@value":"新たな総合評価落札方式の実施状況と効果について"},{"@language":"en","@value":"Implementation and Effectiveness of the New Overall Evaluation Bid Method"},{"@language":"ja-Kana","@value":"アラタ ナ ソウゴウ ヒョウカ ラクサツ ホウシキ ノ ジッシ ジョウキョウ ト コウカ ニ ツイテ"},{"@value":"Implementation status and effects of new comprehensive evaluation bidding method"}],"dc:language":"ja","description":[{"type":"abstract","notation":[{"@language":"en","@value":"The Ministry of Land, Infrastructure, Transport and Tourism has been expanding the application of the overall evaluation bid method, based on the principal of the ”Bill for Ensuring the Quality of Public Works\", enacted in 2005, and the method has been applied for almost all the works ordered by the Ministry since 2007.<br> The bipolarization was introduced in 2013 to resolve the problems of the overall evaluation bid method and it has been implemented throughout the country. In order to clarify the effect of the bipolarization, survey and analysis using the data of FY 2013 were conducted and this pater reports that (1) it was verified a certain degree of effectiveness for the construction capacity evaluation type and (2) improvement is continuously required for the technical proposal evaluation type."},{"@language":"ja","@value":"国土交通省直轄工事においては，平成17年4月に施行された「公共工事の品質確保の促進に関する法律」の基本理念に基づき，透明性の確保，技術競争の促進等の改善効果を期待して総合評価落札方式の適用拡大を図り，平成19年度以降はほぼ全ての直轄工事で総合評価落札方式を適用してきたところである．<br>　平成25年度からは，総合評価落札方式の諸課題に対応するために，新たな施策として「二極化」を打ち出し，全国的に本格運用を開始した．本稿では，二極化により期待される効果の現時点での発現状況等を確認することを目的として平成25年度の総合評価落札方式適用工事に関するデータを基に調査・分析・影響の整理を行った結果，(1)施工能力評価型では一定の効果が発揮されている(2)技術提案評価型では引き続き改善を図る必要があるという実態を確認した．"}],"abstractLicenseFlag":"disallow"}],"creator":[{"@id":"https://cir.nii.ac.jp/crid/1410001205354586753","@type":"Researcher","personIdentifier":[{"@type":"NRID","@value":"9000318586910"}],"foaf:name":[{"@language":"ja","@value":"冨澤 成実"},{"@language":"en","@value":"TOMISAWA Narumi"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"国土技術政策総合研究所 建設マネジメント技術研究室"}]},{"@id":"https://cir.nii.ac.jp/crid/1410001205354586754","@type":"Researcher","personIdentifier":[{"@type":"NRID","@value":"9000318586909"}],"foaf:name":[{"@language":"ja","@value":"森田 康夫"},{"@language":"en","@value":"MORITA Yasuo"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"国土技術政策総合研究所 建設マネジメント技術研究室"}]},{"@id":"https://cir.nii.ac.jp/crid/1410001205354586755","@type":"Researcher","personIdentifier":[{"@type":"NRID","@value":"9000318586911"}],"foaf:name":[{"@language":"ja","@value":"横井 宏行"},{"@language":"en","@value":"YOKOI Hiroyuki"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"株式会社建設技術研究所 マネジメント技術部"}]},{"@id":"https://cir.nii.ac.jp/crid/1410001205354586752","@type":"Researcher","personIdentifier":[{"@type":"NRID","@value":"9000318586908"}],"foaf:name":[{"@language":"ja","@value":"大野 真希"},{"@language":"en","@value":"ONO Masaki"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"国土技術政策総合研究所 建設マネジメント技術研究室"}]}],"publication":{"publicationIdentifier":[{"@type":"EISSN","@value":"21856605"},{"@type":"NDL_BIB_ID","@value":"023327532"}],"prism:publicationName":[{"@language":"en","@value":"Journal of Japan Society of Civil Engineers, Ser. F4 (Construction and Management)"},{"@language":"ja","@value":"土木学会論文集Ｆ４（建設マネジメント）"},{"@value":"土木学会論文集F4（建設マネジメント）"},{"@language":"en","@value":"J. JSCE, Ser. F4"},{"@language":"ja","@value":"土木学会論文集Ｆ４（建設マネジメント）"}],"dc:publisher":[{"@language":"en","@value":"Japan Society of Civil Engineers"},{"@language":"ja","@value":"公益社団法人 土木学会"}],"prism:publicationDate":"2015","prism:volume":"71","prism:number":"4","prism:startingPage":"I_235","prism:endingPage":"I_240"},"reviewed":"false","url":[{"@id":"http://id.ndl.go.jp/bib/027121177"},{"@id":"https://ndlsearch.ndl.go.jp/books/R000000004-I027121177"},{"@id":"https://www.jstage.jst.go.jp/article/jscejcm/71/4/71_I_235/_pdf"}],"availableAt":"2015","foaf:topic":[{"@id":"https://cir.nii.ac.jp/all?q=Bill%20for%20ensuring%20the%20quality%20of%20public%20works","dc:title":"Bill for ensuring the quality of public works"},{"@id":"https://cir.nii.ac.jp/all?q=Overall%20evaluation%20bid%20method","dc:title":"Overall evaluation bid method"},{"@id":"https://cir.nii.ac.jp/all?q=Bipolarization","dc:title":"Bipolarization"}],"relatedProduct":[{"@id":"https://cir.nii.ac.jp/crid/1360857593726135936","@type":"Article","resourceType":"学術雑誌論文(journal article)","relationType":["isReferencedBy"],"jpcoar:relatedTitle":[{"@value":"Price and quality: relationship between bid rate and construction performance rating ranking"}]},{"@id":"https://cir.nii.ac.jp/crid/1390001205356189952","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"ja","@value":"総合評価方式の変遷から見た技術評価方法の課題と改善に関する考察"},{"@language":"en","@value":"STUDY ON THE ISSUES AND IMPROVEMENTS OF THE TECHNICAL EVALUATION METHOD THROUGH THE CHANGE OF THE QUALITY-AND-COST-BASED SELECTION (QCBS) METHOD"},{"@language":"ja-Kana","@value":"ソウゴウ ヒョウカ ホウシキ ノ ヘンセン カラ ミタ ギジュツ ヒョウカ ホウホウ ノ カダイ ト カイゼン ニ カンスル コウサツ"}]}],"dataSourceIdentifier":[{"@type":"JALC","@value":"oai:japanlinkcenter.org:2000945794"},{"@type":"NDL_SEARCH","@value":"oai:ndlsearch.ndl.go.jp:R000000004-I027121177"},{"@type":"CROSSREF","@value":"10.2208/jscejcm.71.i_235"},{"@type":"CIA","@value":"130005142658"},{"@type":"CROSSREF","@value":"10.1108/ijqrm-08-2020-0255_references_DOI_T2LdGTyY2UMGtlg7lJEcpBO8mXs"}]}