{"@context":{"@vocab":"https://cir.nii.ac.jp/schema/1.0/","rdfs":"http://www.w3.org/2000/01/rdf-schema#","dc":"http://purl.org/dc/elements/1.1/","dcterms":"http://purl.org/dc/terms/","foaf":"http://xmlns.com/foaf/0.1/","prism":"http://prismstandard.org/namespaces/basic/2.0/","cinii":"http://ci.nii.ac.jp/ns/1.0/","datacite":"https://schema.datacite.org/meta/kernel-4/","ndl":"http://ndl.go.jp/dcndl/terms/","jpcoar":"https://github.com/JPCOAR/schema/blob/master/2.0/"},"@id":"https://cir.nii.ac.jp/crid/1390296984321369216.json","@type":"Article","productIdentifier":[{"identifier":{"@type":"DOI","@value":"10.2534/jjasnaoe.37.115"}},{"identifier":{"@type":"HDL","@value":"https://hdl.handle.net/2324/7397152"}},{"identifier":{"@type":"NDL_BIB_ID","@value":"032957791"}},{"identifier":{"@type":"URI","@value":"http://id.ndl.go.jp/bib/032957791"}},{"identifier":{"@type":"URI","@value":"https://ndlsearch.ndl.go.jp/books/R000000004-I032957791"}},{"identifier":{"@type":"URI","@value":"https://www.jstage.jst.go.jp/article/jjasnaoe/37/0/37_115/_pdf"}}],"resourceType":"学術雑誌論文(journal article)","dc:title":[{"@language":"en","@value":"Study of the practical application of production          planning method using shipbuilding process simulation"},{"@language":"ja","@value":"船舶建造工程シミュレーションを用いた生産計画立案手法の現場適用に関する研究"},{"@language":"ja-Kana","@value":"センパク ケンゾウ コウテイ シミュレーション オ モチイタ セイサン ケイカク リツアン シュホウ ノ ゲンバ テキヨウ ニ カンスル ケンキュウ"}],"dc:language":"ja","description":[{"type":"abstract","notation":[{"@language":"en","@value":"<p>Shipbuilding is one of the most complex production systems in the        manufacturing industry because of the incredible variety of parts and        highly complex processes. However, production plans are currently        prepared manually depending on the experience of expert workers. In        this paper, a production planning method based on shipbuilding process        simulation is proposed for use in actual shipyards, which        simultaneously satisfies the needs of both production managers, who        require on-time delivery plans, and field workers, who aim to minimize        waiting time and improve operating rates. Specifically, the authors        developed a hybrid method that combines backward and forward        simulation for planning front-loading to meet deadlines and reduce        waiting time. In the case study, the method was applied to a sub        assembly conveyor line in an actual shipyard to demonstrate the        validity and feasibility of the simulation results.</p>"},{"@language":"ja","@value":"<p>Shipbuilding is one of the most complex production systems in the        manufacturing industry because of the incredible variety of parts and        highly complex processes. However, production plans are currently        prepared manually depending on the experience of expert workers. In        this paper, a production planning method based on shipbuilding process        simulation is proposed for use in actual shipyards, which        simultaneously satisfies the needs of both production managers, who        require on-time delivery plans, and field workers, who aim to minimize        waiting time and improve operating rates. Specifically, the authors        developed a hybrid method that combines backward and forward        simulation for planning front-loading to meet deadlines and reduce        waiting time. In the case study, the method was applied to a sub        assembly conveyor line in an actual shipyard to demonstrate the        validity and feasibility of the simulation results.</p>"}],"abstractLicenseFlag":"disallow"}],"creator":[{"@id":"https://cir.nii.ac.jp/crid/1410296984321369217","@type":"Researcher","foaf:name":[{"@language":"en","@value":"Okubo Yui"},{"@language":"ja","@value":"大久保 友結"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"横浜国立大学大学院理工学府"}]},{"@id":"https://cir.nii.ac.jp/crid/1420001326232045056","@type":"Researcher","personIdentifier":[{"@type":"KAKEN_RESEARCHERS","@value":"40741335"},{"@type":"NRID","@value":"1000040741335"},{"@type":"ORCID","@value":"0000-0001-5181-5312"},{"@type":"NRID","@value":"9000018746851"},{"@type":"NRID","@value":"9000399502549"},{"@type":"NRID","@value":"9000410744837"},{"@type":"NRID","@value":"9000410744758"},{"@type":"NRID","@value":"9000411646392"},{"@type":"NRID","@value":"9000366131997"},{"@type":"NRID","@value":"9000413549172"},{"@type":"NRID","@value":"9000415426044"},{"@type":"NRID","@value":"9000413549163"},{"@type":"NRID","@value":"9000405626120"},{"@type":"NRID","@value":"9000410745019"},{"@type":"NRID","@value":"9000410745013"},{"@type":"NRID","@value":"9000415132852"},{"@type":"NRID","@value":"9000413548792"},{"@type":"NRID","@value":"9000413548873"},{"@type":"NRID","@value":"9000410744998"},{"@type":"NRID","@value":"9000415131924"},{"@type":"NRID","@value":"9000413547974"},{"@type":"NRID","@value":"9000413548900"},{"@type":"NRID","@value":"9000413547831"},{"@type":"NRID","@value":"9000413548785"},{"@type":"NRID","@value":"9000413548433"},{"@type":"RESEARCHMAP","@value":"https://researchmap.jp/mitsuyuki"}],"foaf:name":[{"@language":"en","@value":"Mitsuyuki Taiga"},{"@language":"ja","@value":"満行 泰河"}],"jpcoar:affiliationName":[{"@language":"ja","@value":"横浜国立大学大学院工学研究院"}]}],"publication":{"publicationIdentifier":[{"@type":"PISSN","@value":"18803717"},{"@type":"LISSN","@value":"18803717"},{"@type":"EISSN","@value":"18811760"},{"@type":"NDL_BIB_ID","@value":"000007809153"},{"@type":"ISSN","@value":"18803717"},{"@type":"NCID","@value":"AA12057769"}],"prism:publicationName":[{"@language":"en","@value":"Journal of the Japan Society of Naval Architects and Ocean Engineers"},{"@language":"ja","@value":"日本船舶海洋工学会論文集"},{"@language":"en","@value":"J.JASNAOE"},{"@language":"ja","@value":"日本船舶海洋工学会論文集"}],"dc:publisher":[{"@language":"en","@value":"The Japan Society of Naval Architects and Ocean Engineers"},{"@language":"ja","@value":"公益社団法人 日本船舶海洋工学会"}],"prism:publicationDate":"2023","prism:volume":"37","prism:number":"0","prism:startingPage":"115","prism:endingPage":"123"},"reviewed":"false","dcterms:accessRights":"http://purl.org/coar/access_right/c_abf2","url":[{"@id":"http://id.ndl.go.jp/bib/032957791"},{"@id":"https://ndlsearch.ndl.go.jp/books/R000000004-I032957791"},{"@id":"https://www.jstage.jst.go.jp/article/jjasnaoe/37/0/37_115/_pdf"}],"availableAt":"2023","relatedProduct":[{"@id":"https://cir.nii.ac.jp/crid/1050588369394750976","@type":"Article","resourceType":"学術雑誌論文(journal article)","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"en","@value":"Ship Production Planning Using Shipbuilding System Modeling and Discrete Time Process Simulation"}]},{"@id":"https://cir.nii.ac.jp/crid/1360013172343985920","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"A Shipyard Simulation System using the Process-centric Simulation Modeling Methodology: Case Study of the Simulation Model for the Shipyard Master Plan Validation"}]},{"@id":"https://cir.nii.ac.jp/crid/1360016866553396096","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Production orders planning using additional backward pass scheduling approach"}]},{"@id":"https://cir.nii.ac.jp/crid/1360016867630198144","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards"}]},{"@id":"https://cir.nii.ac.jp/crid/1360016870037166720","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Study on Job Shop Scheduling for Keeping the Requested Shipping Sequence by Production System Modeling and Backward Simulation"}]},{"@id":"https://cir.nii.ac.jp/crid/1360857596856942592","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Development of the Decision-Making System for the Ship Block Logistics Based on the Simulation"}]},{"@id":"https://cir.nii.ac.jp/crid/1360861293077696000","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Discrete Event Simulation: An Efficient Tool to Assist Shipyard Investment and Production Planning"}]},{"@id":"https://cir.nii.ac.jp/crid/1364233268694256512","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@value":"Design of production strategy considering the cutting peak demand of electricity in the shipbuilding industry"}]},{"@id":"https://cir.nii.ac.jp/crid/1390001204094237440","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"en","@value":"Development of Shipyard Simulation System based on Petri Net"},{"@value":"ペトリネットを利用した工場シミュレータの構築"},{"@language":"ja-Kana","@value":"ペトリネット オ リヨウ シタ コウジョウ シミュレータ ノ コウチク ダイ2ホウ サギョウ ジョウホウ ノ ショウサイカ ニ ジュウナン ニ タイオウ スル コウジョウ シミュレータ ノ コウチク"},{"@language":"ja","@value":"ペトリネットを利用したシミュレータの構築 : 第2報:作業情報の詳細化に柔軟に対応する工場シミュレータの構築"}]},{"@id":"https://cir.nii.ac.jp/crid/1390001205255729920","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"ja","@value":"Max-Plus 代数に基づくツインタンデム建造方式の組立日程計画"},{"@language":"en","@value":"Max-plus-algebra based scheduling of ship building lines for tandem construction of a pair of ships"},{"@language":"ja-Kana","@value":"Max-Plus ダイスウ ニ モトズク ツインタンデム ケンゾウ ホウシキ ノ クミタテ ニッテイ ケイカク"}]},{"@id":"https://cir.nii.ac.jp/crid/1390282679070910208","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"en","@value":"Systemization of Production Control in the Shipyard"},{"@value":"造船工場生産管理システム化への考察"},{"@language":"ja-Kana","@value":"ゾウセン コウジョウ セイサン カンリ システムカ エ ノ コウサツ"}]},{"@id":"https://cir.nii.ac.jp/crid/1390282679070949632","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"en","@value":"Development of production planning system by using virtual factory"},{"@value":"バーチャルファクトリーを用いた生産計画システムの開発"},{"@language":"ja-Kana","@value":"バーチャル ファクトリー オ モチイタ セイサン ケイカク システム ノ カイハツ"}]},{"@id":"https://cir.nii.ac.jp/crid/1390282679071441280","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"en","@value":"Development of Shipyard Simulation System based on Petri Nets"},{"@value":"ペトリネットを利用した工場シミュレータの構築"},{"@language":"ja-Kana","@value":"ペトリネット オ リヨウ シタ コウジョウ シミュレータ ノ コウチク ダイ3ポウ ジョウバン モデル オ ドウニュウ シタ コウジョウ シミュレータ"},{"@language":"ja-Kana","@value":"ペトリ ネット オ リヨウシタ ゾウセン コウジョウ シミュレータ ノ コウチ"},{"@language":"ja","@value":"ペトリネットを利用した造船工場シミュレータの構築"},{"@language":"ja","@value":"ペトリネットを利用した工場シミュレータの構築 : 第3報:定盤モデルを導入した工場シミュレーター"}]},{"@id":"https://cir.nii.ac.jp/crid/1390282680231027584","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"ja","@value":"離散事象システム理論に基づく造船ラインのスケジューリング"},{"@language":"en","@value":"On scheduling ship-building lines based on discrete-event system theory"},{"@language":"ja-Kana","@value":"リサン ジショウ システム リロン ニ モトヅク ゾウセン ライン ノ スケジューリング"},{"@value":"11 離散事象システム理論に基づく造船ラインのスケジューリング"}]},{"@id":"https://cir.nii.ac.jp/crid/1390282680492593920","@type":"Article","relationType":["references"],"jpcoar:relatedTitle":[{"@language":"ja","@value":"システム開発プロジェクトにおける手戻りリスクを考慮したタスク優先ルール設計に関する研究"},{"@language":"en","@value":"A study on designing task priority rule considering rework risk of system development project"}]}],"dataSourceIdentifier":[{"@type":"JALC","@value":"oai:japanlinkcenter.org:2010746381"},{"@type":"IRDB","@value":"oai:irdb.nii.ac.jp:01211:0007226050"},{"@type":"NDL_SEARCH","@value":"oai:ndlsearch.ndl.go.jp:R000000004-I032957791"},{"@type":"CROSSREF","@value":"10.2534/jjasnaoe.37.115"}]}