A Study on the Operation of a Balancing Group Consisting of PVs and On-site Storage Batteries
-
- Oki Shungo
- Graduate School of Information Science and Technology, Hokkaido University
-
- Hara Ryoichi
- Graduate School of Information Science and Technology, Hokkaido University
-
- Kita Hiroyuki
- Graduate School of Information Science and Technology, Hokkaido University
-
- Akatsuka Motoki
- National Institute of Technology, Tomakomai College
Bibliographic Information
- Other Title
-
- 太陽光発電とオンサイト蓄電池で構成されるバランシンググループの運用に関する研究
Search this article
Description
<p>The renewable energy resources, such as photovoltaic generation and wind turbine, are rapidly being integrated. In order to compensate for the variable output and imbalance between actual and scheduled outputs, introduction of a battery storage would be one of the promising solutions. In this paper, we focus on the scheduled operation of a balancing group (BG) consisting of the widely distributed photovoltaic generation with storage battery. BG forming would bring reduction of total imbalance due to cancellation of forecast errors among PV stations, and could enable cooperative usage of battery storages for imbalance compensation. This paper proposes a new battery storages operation scheduling for the BG considering the imbalance risk, which are assumed based on the confidence interval forecast for PV output. Effectiveness of the proposed scheduling method is ascertained through year-basis computational simulation of the BG. Advantages of BG forming is also discussed.</p>
Journal
-
- IEEJ Transactions on Power and Energy
-
IEEJ Transactions on Power and Energy 143 (5), 260-269, 2023-05-01
The Institute of Electrical Engineers of Japan
- Tweet
Details 詳細情報について
-
- CRID
- 1390858906233431168
-
- ISSN
- 13488147
- 03854213
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- OpenAIRE
-
- Abstract License Flag
- Disallowed

