Early Step to Prevent Environmental Impacts in Mining Project

抄録

The purpose of the work is to show that an early data acquisition for environmental impact assessment is very important in mining operation. Study of the mineralogy, hydrochemistry, hydrogeological systems, and groundwater flow modeling, showed that in the abandoned Messel Pit area soils and natural springs have indicated high arsenic content, and the high arsenic content in groundwater was dominantly caused by natural condition. Arsenic in Buyat Village's groundwater is believed originally coming from the oxidation of sulphide minerals (arsenopyrite) in the alluvial deposit. In the case of Sorowako Nickel Mine, high concentration of Cr^<6+> were found at ore stockpiles, open pit areas, and ex-pit ponds. With suitable data preparation and analysis, environmental impacts in mining operation could be managed and minimized. As a conclusion, environmental data acquisition for environmental impact assessment should be started during the early phase of mine development in line with the exploration program.

収録刊行物

被引用文献 (0)*注記

もっと見る

参考文献 (0)*注記

もっと見る

関連論文

もっと見る

関連研究データ

もっと見る

関連図書・雑誌

もっと見る

関連博士論文

もっと見る

関連プロジェクト

もっと見る

関連その他成果物

もっと見る

詳細情報

  • CRID
    1050564285864836864
  • ISSN
    1884-6300
  • Web Site
    http://hdl.handle.net/2324/21040
  • 本文言語コード
    en
  • 資料種別
    departmental bulletin paper
  • データソース種別
    • IRDB
ページトップへ