プロジェクトのスケジュール・ネットワークの遅延リスク耐性の評価について
書誌事項
- タイトル別名
-
- Evaluation of Delay Risk Tolerance of Project Schedule Network
この論文をさがす
説明
In the schedule management of large-scale and complicated projects, the problem of uncertainty due to required time fluctuation is remarkable, and the location of the longest work path (critical path) that determines the whole period of the project changes irregularly. Therefore, even with a margin of non-critical activity that need not be managed in the conventional project, it is necessary to manage it in recent projects. In this research, when the project is represented by the schedule network of Activity, we propose a method to evaluate the tolerance of the project to the delay risk of the whole project. In this paper, we propose a method to use the number of delay patterns of Activity level that does not change the duration of the whole project as an indicator of delay risk tolerance. Furthermore, the effectiveness of the proposed method was experimentally verified. As a result, the validity of the proposed method was confirmed.
収録刊行物
-
- 宮崎大学工学部紀要
-
宮崎大学工学部紀要 47 237-241, 2018-07
宮崎大学工学部
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1050007314771739264
-
- NII論文ID
- 120007120671
-
- NII書誌ID
- AA00732558
-
- ISSN
- 05404924
-
- HANDLE
- 10458/6443
-
- 本文言語コード
- ja
-
- 資料種別
- departmental bulletin paper
-
- データソース種別
-
- IRDB
- CiNii Articles