リスク・安定性・規模を考慮した電源開発に関する選択モデリングのパイロットスタディ

書誌事項

タイトル別名
  • Pilot Study for Eliciting Preferences for Electricity Supply in Japan while Simultaneously Considering Risk, Fluctuations, and Size with Choice Modeling

この論文をさがす

抄録

40020326636

We conducted a pilot study using an energy option choice experiment (CE) survey with undergraduate samples, which is one of the choice modeling approaches. Our CE questions relate to risk increase, supply stability, power utility/facility size, and fee increase regarding a hypothetical electricity generation project in the Tokyo metropolitan area. As a result, the respondents accepted increases in climate-change and ecosystem risks. On the other hand, they were reluctant to accept health risk increases related to electricity generation and supply. We could not find any significant parameter with regard to stable electricity supply and utility/facility size.

首都圏の電源開発について,選択モデリングの一種である選択型実験(choice experiment: CE)に関するパイロット調査を実施した.サンプルは学部学生を用いた.CEを構成する属性として,電源開発に起因する様々なリスクの上昇,供給の安定性,電源施設・設備の規模と,電力料金の値上がりを採用し,首都圏における仮想的な電源開発プロジェクトを設定した.分析の結果,電源開発に起因する気候変動および生態系リスクの上昇が回答者に受け入れられた一方で,健康リスクの上昇は忌避される傾向にあることを確認した.また,安定的な電力供給や,電源施設・設備規模については選好抽出にいたらなかった.

収録刊行物

  • 情報学研究

    情報学研究 (4), 65-74, 2015-01

    獨協大学情報学研究所

詳細情報 詳細情報について

問題の指摘

ページトップへ