徳島県南部の救急医療の現状と新たな取り組み : 脳神経外科の立場から

機関リポジトリ Web Site オープンアクセス

書誌事項

タイトル別名
  • トクシマケン ナンブ ノ キュウキュウ イリョウ ノ ゲンジョウ ト アラタナ トリクミ : ノウシンケイ ゲカ ノ タチバ カラ
  • The present conditions of the emergency care of South Tokushima and new action : From a neurosurgical viewpoint

この論文をさがす

説明

A regular neurosurgeon was absent in the southern part II health demographic division of medical services where Kaifu-gun of South Tokushima was located after 2008 and was the present conditions that stroke treatment could not perform enough in comparison with prefecture central part. Furthermore, medical care collapse progressed with the obstetrics and gynecology department and pediatrics closedown at one sweep from the same period and, at the prefectural Kaifu Hospital which was this local nucleus hospital, became hard to maintain the emergency care, and increase of closedown of the emergency outpatient department on Saturday and the emergency transportation to the prefecture central part became remarkable, and it was with a big social problem for Tokushima. A medical difference might occur about stroke medical care in central part and the southern part in Tokushima. We performed the epidemiology survey by stroke patient in the southern II demographic division of medical services (popular name “Kaifu project”) as a President of University of Tokushima discretion project for this fact-finding individually in the University of Tokushima neurosurgery classroom. In addition, I worked on the enlightenment for inhabitants in Kaifu-gun. “Local neurosurgical medical treatment part” was established as a college course financially maintained by private donations of Tokushima University Hospital from November 1,2011. Kaifu Hospital neurosurgery medical treatment was enabled daylong, and emergency correspondence came to be in this way possible. The Kaifu Hospital devises the maintenance policy about Tokushima, local inhabitants, a medical association, a local government and the figure which there should be of “the new Kaifu Hospital” for a tsunami now in the plan of the full-scale reconstruction move to the hill in 2015.

収録刊行物

詳細情報 詳細情報について

問題の指摘

ページトップへ