Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints
-
- Weibo Ren
- Industrial and Systems Engineering Laboratory, School of Mechanical Engineering, Beijing Institute of Technology, Beijing, People’s Republic of China
-
- Yan Yan
- Industrial and Systems Engineering Laboratory, School of Mechanical Engineering, Beijing Institute of Technology, Beijing, People’s Republic of China
-
- Yaoguang Hu
- Industrial and Systems Engineering Laboratory, School of Mechanical Engineering, Beijing Institute of Technology, Beijing, People’s Republic of China
-
- Yu Guan
- Industrial and Systems Engineering Laboratory, School of Mechanical Engineering, Beijing Institute of Technology, Beijing, People’s Republic of China
Journal
-
- International Journal of Production Research
-
International Journal of Production Research 60 (18), 5675-5696, 2021-08-30
Informa UK Limited
- Tweet
Details 詳細情報について
-
- CRID
- 1360861292425817728
-
- ISSN
- 1366588X
- 00207543
-
- Data Source
-
- Crossref