Safety Stock versus Safety Time in MRP Controlled Production Systems

  • J. A. Buzacott
    Faculty of Administrative Studies, York University, 4700 Keele Street, North York, Ontario, Canada M3J 1P3
  • J. G. Shanthikumar
    University of California, Berkeley, California 94720

書誌事項

公開日
1994-12
DOI
  • 10.1287/mnsc.40.12.1678
公開者
Institute for Operations Research and the Management Sciences (INFORMS)

この論文をさがす

説明

<jats:p> The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time and the degree of congestion, together with the costs of inventory and shortages. These influences are explored using stochastic models of a single stage manufacturing system for which work release is controlled using MRP. The major conclusion is that safety time is usually only preferable to safety stock when it is possible to make accurate forecasts of future required shipments over the lead time, otherwise safety stock is more robust in coping with changes in customer requirements in the lead time or with fluctuations in forecasts of lead time demand. </jats:p>

収録刊行物

  • Management Science

    Management Science 40 (12), 1678-1689, 1994-12

    Institute for Operations Research and the Management Sciences (INFORMS)