Operation of Kinu River Dams for “Kanto-Tohoku Heavy Rainfall Disaster on September 2015”

  • TABATA Kazuhiro
    国土交通省 関東地方整備局 霞ヶ浦導水工事事務所

Bibliographic Information

Other Title
  • 平成27年9月関東・東北豪雨における鬼怒川上流ダム群の操作について
  • ヘイセイ 27ネン 9ガツ カントウ ・ トウホク ゴウウ ニ オケル キヌガワ ジョウリュウ ダムグン ノ ソウサ ニ ツイテ

Search this article

Description

<p>“Kanto-Tohoku heavy rainfall disaster on September 2015” due to an unprecedented rainfall on September 9th through 10th caused serious damage such as embankment collapse in Kinugawa River basin. Four MLIT dams in the upstream area of Kinugawa River (Ikari, Kawamata, Kawaji and Yunishigawa) contributed greatly to the flood damage reduction by implementing operations using the flood control capacity as much as possible and reducing outflow from the dams considering downstream water level and damage. The total amount stored in the dams was about 100 million m3.</p>