Record and Technique Succession of Crisis Response for Numappara Dam Water Leakage on The 2011 Tohoku Earthquake
-
- OKUMURA Hirofumi
- 電源開発株式会社 土木建築部 土木技術室 水力・構造タスク
-
- MATSUMOTO Tadashi
- 電源開発株式会社 原子力技術部 土木耐震タスク
-
- KOYAMA Kikuji
- 電源開発株式会社 東日本支店 沼原電力所
-
- NOGUCHI Shunsuke
- 電源開発株式会社 原子力技術部
Bibliographic Information
- Other Title
-
- 平成23年3月東北地方太平洋沖地震沼原ダム災害対応記録
- ヘイセイ 23ネン 3ガツ トウホク チホウ タイヘイヨウオキ ジシン ヌマ ゲン ダム サイガイ タイオウ キロク
Search this article
Description
On 11th March 2011, the 2011 Tohoku Earthquake occured. The Earthquake caused some cracks, total length of which reached to 1,547m, in the asphaltic facing of Numappara Dam which J POWER owns. After the earthquake, water leakage through the cracks increased and then the dam water level was drawn down immediately in control. We just managed to succeed in the crisis response of the reservoir water leakage and it is greatly desiable to share empirical knowledge for possible crisis management in the future. With such a backgroud, we have edited the “Record of Crisis Response in Numappara Dam on the 2011 Tohoku Earthquake”. This paper shows the outline of the damages, our actions taken just after the earthquake and konwledge learned from this crisis.
Journal
-
- Journal of Japan Society of Dam Engineers
-
Journal of Japan Society of Dam Engineers 25 (2), 99-104, 2015
Japan Society of Dam Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390001204381496576
-
- NII Article ID
- 130005083630
-
- NII Book ID
- AN10442669
-
- ISSN
- 18808220
- 09173145
-
- NDL BIB ID
- 026563355
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL
- CiNii Articles
-
- Abstract License Flag
- Disallowed