A Method for Effective Utilization of Power Distribution Apparatus in Industrial Park by Looping Distribution Lines
-
- Simanjorang Rejeki
- Division of Electrical, Electronic and Information Eng., Graduate School of Eng., Osaka University
-
- Miura Yushi
- Division of Electrical, Electronic and Information Eng., Graduate School of Eng., Osaka University
-
- Ise Toshifumi
- Division of Electrical, Electronic and Information Eng., Graduate School of Eng., Osaka University
-
- Sugimoto Shigeyuki
- Chubu Electric Power Company, Co. Inc.
-
- Fujita Hideki
- JFCC
この論文をさがす
抄録
A method for effective utilization of power distribution apparatus in an industrial park by looping distribution lines is proposed. The proposed method uses a series type Back-To-Back (BTB) converter in loop distribution line. This method solves the problem of heavily-loaded and lightly-loaded lines condition in distribution line autonomously. The problem of heavily-loaded and lightly- loaded lines results in lower utilization of transformers and increases losses in electricity system of the industrial park. By employing this proposed method, effective utilization of apparatus is realized by minimizing circulating current and balancing power of transformers in loop distribution line. One of the major characteristics of the proposed scheme is that the required converter capacity is small and it can be installed close to the transformers in loop distribution line. Analysis and simulation results to validate the proposed method are presented in this paper.
収録刊行物
-
- 電気学会論文誌B(電力・エネルギー部門誌)
-
電気学会論文誌B(電力・エネルギー部門誌) 127 (11), 1127-1136, 2007
一般社団法人 電気学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390001204601428608
-
- NII論文ID
- 10019770794
-
- NII書誌ID
- AN10136334
-
- ISSN
- 13488147
- 03854213
-
- NDL書誌ID
- 9253013
-
- 本文言語コード
- en
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可