A Flexible Decision Method for Transmission System Expansion Planning Considering Power Interruption Cost

Bibliographic Information

Other Title
  • 停電コストを考慮した柔軟な送電設備拡充計画決定法
  • テイデン コスト オ コウリョシタ ジュウナン ナ ソウデン セツビ カクジュ

Search this article

Abstract

Under the current deregulation of electric utility industry, power system planning has become more complex. System planners are required to study how to use the available resources to meet customer's demand economically with an acceptable reliability and quality. The integrated resource planning is emerged as one of the effective approach for this problem recently and the approach has been expanded to include the value of reliability, that is, power interruption cost.<br> This paper is aimed to develop a flexible decision method to select a favorable plan among various transmission system expansion alternatives, not only from power supplier's view point, but also from customer's perspective including cost of interruption.<br> Bellman-Zadeh's maximizing decision using fuzzy decision set is applied as an flexible decision method which is able to reflect the planner's intensions. Numerical examples are shown to ascertain the effectiveness of the proposed method.

Journal

Citations (2)*help

See more

References(10)*help

See more

Details 詳細情報について

Report a problem

Back to top