書誌事項
- タイトル別名
-
- A Verification of Automatic Frequency Controller for Minami-Fukumitsu Back-To-Back Converter Station
- ミナミ フクミツ チョクリュウレンケイ セツビ ニ オケル シュウハスウ アンテイカ セイギョ ノ ケンショウ
この論文をさがす
説明
Minami-Fukumitsu BTB (Back-To-Back) Converter Station is the first nonsynchronous link facility within the Japanese 60Hz system and it connects the system of Chubu Electric Power and Hokuriku Electric Power. An Automatic Frequency Controller (AFC) is installed in this facility to stabilize the frequency of the power system after a large disturbance (like one part of power system is divided from the other part) and to enhance suppression of frequency fluctuation.<br> This paper describes individual problems and countermeasures to install optimal multi-variable control AFC and introduces a part of test results using actual power system to verify performance of control systems. This paper also shows effectiveness of analysis using digital simulation tools.
収録刊行物
-
- 電気学会論文誌B(電力・エネルギー部門誌)
-
電気学会論文誌B(電力・エネルギー部門誌) 121 (9), 1069-1075, 2001
一般社団法人 電気学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390001204604488704
-
- NII論文ID
- 130006841008
- 10006759046
-
- NII書誌ID
- AN10136334
-
- ISSN
- 13488147
- 03854213
-
- NDL書誌ID
- 5894174
-
- データソース種別
-
- JaLC
- NDLサーチ
- Crossref
- CiNii Articles
- OpenAIRE
-
- 抄録ライセンスフラグ
- 使用不可