ESTIMATION OF THE WHOLE LIFE COST OF POST OFFICES BASED ON A SURVEY OF ACTUAL CONDITIONS AND CONSIDERATION OF INVESTMENT CORRECTION

Bibliographic Information

Other Title
  • 郵便局長舎の実態調査に基づく生涯費用の推定および投資適正化への考察

Search this article

Abstract

By undertaking an enumeration survey of the operating costs of 1255 general post offices throughout Japan, we were able to grasp the characteristics of the life-cycle costs of post office buildings. After analyzing the relationship between the rebuilding cycle, and rebuilding, repair and improvement costs, by changing the present rebuilding at age 40 to building additions at age 40 and rebuilding at age 60, it became apparent that, we could expect a significant reduction in facilities investment costs.

Journal

References(21)*help

See more

Details 詳細情報について

Report a problem

Back to top