A STUDY OF TRAIL CALCULATION CONDITION OF COMPREHENSIVE MANAGEMENT PLAN OF PUBLIC FACILITIES AND INFRASTRUCTURES
-
- MOMOHARA Yuji
- Finance and Administration Div., Nisshin City
-
- KATO Daisuke
- Finance and Administration Div., Nisshin City
-
- TSUNEKAWA Kazuhisa
- Graduate School of Engineering, Nagoya Univ.
Bibliographic Information
- Other Title
-
- 公共施設等総合管理計画における試算条件に関する考察
- 公共施設等総合管理計画における試算条件に関する考察 : 愛知県日進市の事例
- コウキョウ シセツ トウ ソウゴウ カンリ ケイカク ニ オケル シサン ジョウケン ニ カンスル コウサツ : アイチケン ニッシンシ ノ ジレイ
- −愛知県日進市の事例−
- – A case study in Nisshin city, Aichi pref. –
Search this article
Description
This report is a summary of creating a “Comprehensive Management Plan for Public Facilities and Infrastructure” in Nisshin City, Aichi Prefecture. The difference in results obtained through trial calculation conditions based on the prospects for available resources and for medium and long term expenses were compared and analyzed. The analysis showed that results differed greatly depending on the trial calculation conditions. Items necessary to prepare a feasible “Comprehensive Management Plan for Public Facilities and Infrastructure” in the future are conditioned.
Journal
-
- AIJ Journal of Technology and Design
-
AIJ Journal of Technology and Design 24 (56), 403-407, 2018
Architectural Institute of Japan
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390001205173251072
-
- NII Article ID
- 130006386899
-
- NII Book ID
- AN10531441
-
- ISSN
- 18818188
- 13419463
-
- NDL BIB ID
- 028847266
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL Search
- Crossref
- CiNii Articles
- OpenAIRE
-
- Abstract License Flag
- Disallowed