Development of Blast Furnace Gas Dry Cleaning System

Bibliographic Information

Other Title
  • 高炉ガス乾式除塵設備の開発
  • コウロ ガス カンシキ ジョジン セツビ ノ カイハツ

Search this article

Abstract

Recently, top gas pressure recovery turbine units have been installed in most steelmaking plants for energy saving purpose. In Kokura steel works, a wet axial flow turbine was installed at No. 2BF in March, 1979. This unit has been working satisfactorily and consuming less energy. Furthermore a development was made on the Blast-furnace Gas Dry Cleaning System (BDC) and the wet axial flow turbine was reconstructed. After the small bagfilter test and several other kinds of tests at the pilot BDC unit on the same scale as the new commercial unit, the BDC unit was installed at No. 2BF in Kokura steel works in March, 1982. This unit is working satisfactorily. At the same time the wet axial flow turbine was converted to the dry axial flow turbine. This system resulted in the power increase of about 45% compared with the conventional one.

Journal

  • Tetsu-to-Hagane

    Tetsu-to-Hagane 68 (15), 2101-2107, 1982

    The Iron and Steel Institute of Japan

Details 詳細情報について

Report a problem

Back to top