Behaviors of girder and backfill of GRS integral bridge focusing on tension force of geosynthetics
-
- SASAKI Tetsuya
- Railway Technical Research Institute
-
- NISHIOKA Hidetoshi
- Railway Technical Research Institute
-
- KOJIMA Kenichi
- Railway Technical Research Institute
-
- TAKANO Yusuke
- Japan Railway Construction, Transport and Technology Agency
-
- SUYAMA Yusuke
- Japan Railway Construction, Transport and Technology Agency
-
- AOKI Hifumi
- 株式会社 レールウェイエンジニアリング
Bibliographic Information
- Other Title
-
- 補強盛土一体橋梁における橋梁部の伸縮挙動と背面盛土の沈下状況に関する一考察
- ホキョウ モリツチ イッタイ キョウリョウ ニ オケル キョウリョウブ ノ シンシュク キョドウ ト ハイメン モリツチ ノ チンカ ジョウキョウ ニ カンスル イチ コウサツ
Search this article
Description
GRS integral bridge is applied for the first time as a railway structure in Hokkaido Shinkansen, and long-term and under-construction measurement are being carried out.From the characteristics of the GRS integral bridge, tensile displacement to geotextile occurs repeatedly by forced displacement due to expansion and contraction of concrete action.In addition, the possibility of tensile displacement to geotextile in the displacement-to-back direction of the approach block is caused to act is concerned.In this paper, to organize the data obtained from the long-term dynamics measurement, for the displacement situation back embankment and stretching behavior of the bridge part that affects the tensile displacement of geotextile , and the behavior of the actual structure was discussed.
Journal
-
- Geosynthetics Engineering Journal
-
Geosynthetics Engineering Journal 29 (0), 205-208, 2014
Japan Chapter of International Geosynthetics Society