タイ国チャオプラヤー川流域内の大規模ダム貯水池の新しい簡便な運用方法の提案と検証

書誌事項

タイトル別名
  • PROPOSAL AND VERIFICATION OF A NEW SIMPLE RESERVOIR OPERATION FOR LARGE SCALE RESERVOIRS IN THE CHAO PHRAYA BASIN, THAILAND
  • タイコク チャオプラヤーカワ リュウイキ ナイ ノ ダイキボ ダム チョスイチ ノ アタラシイ カンベン ナ ウンヨウ ホウホウ ノ テイアン ト ケンショウ

この論文をさがす

抄録

The Chao Phraya River basin (CPRB) in Thailand had a massive flooding in 2011, which affected on not only Thai socio-economics but also global supply-chain of industrial production. The Thai government is planning watershed management for the CPRB. In order to propose a new reservoir operation system on science-based which can be easily put into practice, we studied a reservoir optimum operation for Bhumibol and Sirikit reservoirs in the CPRB. This paper proposed the new reservoir operation method that daily release discharge were decided by using the day before storage volume data. A usefulness of the reservoir operation method was verified using historical hydrological data. As a result, the proposed reservoir operation method could contribute stabilization of storage volume.

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (1)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ