THE PROCESS AND BACKGROUND TO THE CLOSING UP OF ESTUARY OF THE NIKKO RIVER IN LOWLAND

DOI

Bibliographic Information

Other Title
  • 低平地河川日光川の河口締切に至る過程と背景

Abstract

 The Nikko River that flows through the lowland in the western area of Aichi Prefecture has had a difficulty in preventing typhoon disaster such as storm-surge and inundation damages for a considerably long time. As a solution of this problem, the construction of flood gates started in 1955 in order to close up the estuary of the river, and completed in 1962. During the construction period the area was fiercely struck by the typhoon Isewan in 1959. This paper is to review the process of planning and developing the project of the Nikko River disaster prevention, and to investigate and clarify the factors that caused to delay the progress of the project.

Journal

Details 詳細情報について

  • CRID
    1390001205355430272
  • NII Article ID
    130004559452
  • DOI
    10.2208/jscejhsce.69.90
  • ISSN
    21856532
  • Text Lang
    ja
  • Data Source
    • JaLC
    • Crossref
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top