THE PROCESS AND BACKGROUND TO THE CLOSING UP OF ESTUARY OF THE NIKKO RIVER IN LOWLAND
-
- YASUI Masahiko
- 愛知県建設部砂防課
Bibliographic Information
- Other Title
-
- 低平地河川日光川の河口締切に至る過程と背景
Abstract
The Nikko River that flows through the lowland in the western area of Aichi Prefecture has had a difficulty in preventing typhoon disaster such as storm-surge and inundation damages for a considerably long time. As a solution of this problem, the construction of flood gates started in 1955 in order to close up the estuary of the river, and completed in 1962. During the construction period the area was fiercely struck by the typhoon Isewan in 1959. This paper is to review the process of planning and developing the project of the Nikko River disaster prevention, and to investigate and clarify the factors that caused to delay the progress of the project.
Journal
-
- Journal of Japan Society of Civil Engineers, Ser. D2 (Historical Studies in Civil Engineering)
-
Journal of Japan Society of Civil Engineers, Ser. D2 (Historical Studies in Civil Engineering) 69 (1), 90-103, 2013
Japan Society of Civil Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1390001205355430272
-
- NII Article ID
- 130004559452
-
- ISSN
- 21856532
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed