Mini-Bench Method in Soft Rock using Roadheader and Gantry-Jumbo

DOI
  • KAWATA Takashi
    清水・日本国土・井上共同企業体里見トンネル作業所
  • HATTORI Kazuo
    清水・日本国土・井上共同企業体里見トンネル作業所
  • UMEZAWA Hajime
    清水・日本国土・井上共同企業体里見トンネル作業所
  • ICHIHASHI Manabu
    日本鉄道建設公団北陸新幹線建設局工事第一課
  • SAITO Hiroshi
    日本鉄道建設公団北陸新幹線建設局安中鉄道建設所

Bibliographic Information

Other Title
  • 自由断面掘削機とガントリージャンボによる軟岩地山のミニベンチ工法

Abstract

Satomi Tunnel is one of the long tunnels with the 2, 493m length for the Hokuriku Shin-kansen project under construction by Japan Railway Construction Public Corporaition (JRCC). The construction of Satomi Tunnel introduces the roadheader for the full-face excavation and multi-functional gantry-jumbo for the improvementsin the safety and working condition by the centralization of the working spots using the mini- bench method in the soft rock.<BR>The paper reports about the construction data of the mechanical excavation and deformation patterns of the tunnel based upon the obsevation.

Journal

Details 詳細情報について

  • CRID
    1390001205398551296
  • NII Article ID
    130004387110
  • DOI
    10.11532/journalte1991.2.227
  • ISSN
    18849091
  • Data Source
    • JaLC
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top