抄録

The shield tunnel constructed in Ichikawa city was suffered with many cracks especially on the K-segments. To find out the reason of this, first we investigated a lot of past constraction data in similar soft silt layer. Then, we examined several countermeasures to prevent from the crack and maintain the setting-up quality. As a result, we finally found that the cracks were due to the vertical contact of the segments with the machine tail, and this phenomenon tended to happen when a machine excavated along a vertical slope.The estimated vertical force caused by this contact was around 100tf, which we should appropriately consider into the segment designing.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390001205398896128
  • NII論文ID
    130004387192
  • DOI
    10.11532/journalte1991.4.235
  • ISSN
    18849091
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ