RAPID EXCAVATION FOR LONG TUNNEL “GORIGAMINE TUNNEL” ON HOKURIKU SAINKANSEN
-
- MORITTOU Shinji
- 日本鉄道建設公団北陸新幹線建設局
-
- ICHIKAWA Mitsushi
- 日本鉄道建設公団北陸新幹線建設局戸倉鉄道建設所
Bibliographic Information
- Other Title
-
- 北陸新幹線五里ケ峯トンネルの急速施工について
Abstract
This tunnel is provided for double track railways for SHINKANSEN.<BR>Total length of GORIGAIIINE TUNNEL is 15.2km. Construction work site has been divided into four sections. TOGURA work section is planned to exacavate approximately 5km, after exacavation of the 620m horizontal shaft, the exacavation work is carried out rapidly by means of the total section blasting method by NATN, by full use of the large motordriven loading shovel and 6-boom gantry jambo crane.
Journal
-
- PROCEEDINGS OF TUNNEL ENGINEERING, JSCE
-
PROCEEDINGS OF TUNNEL ENGINEERING, JSCE 3 201-206, 1993
Japan Society of Civil Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390001205398943744
-
- NII Article ID
- 130004387141
-
- ISSN
- 18849091
-
- Data Source
-
- JaLC
- CiNii Articles
-
- Abstract License Flag
- Disallowed