トンネル坑口部の大規模落石防護対策工について

DOI
  • 善光 健治
    日本鉄道建設公団北陸新幹線第二建設局
  • 宮崎 竜聖
    日本鉄道建設公団北陸新幹線第二建設局糸魚川鉄道建設所
  • 野上 隆志
    日本鉄道建設公団北陸新幹線第二建設局糸魚川鉄道建設所
  • 宮本 雅文
    佐藤工業株式会社北陸支店土木部
  • 上野 悟
    佐藤工業株式会社北陸支店土木部

書誌事項

タイトル別名
  • PREVENTION OF LARGE-SCALE FALLING ROCKS ABOVE TUNNEL PORTAL

抄録

Omi tunnel on Hokuriku-shinkansen is located on westside area of the Itoigawa-Shizuoka tectonic line, which is one of the major geological tectonic lines in Japan, with complicated geological formation structure and distribution.<BR>The upper part of the Omi tunnel west portal is covered with overhanging cliff about 20 metershigh, and the slope above the cliff is spotted with many loose rocks and boulders.The lower portal is distributed with talus cone sedimentation and fallen rocks from the cliff.<BR>We present the processes from our overall study, planning, selection and execution of adopted for the prevention measures of large-scale falling rocks, in consideration of topography, geology and safety during and after the construction.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390001205399029120
  • NII論文ID
    130004386921
  • DOI
    10.11532/journalte1991.12.201
  • ISSN
    18849091
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ