施工10年後のセグメント応力測定結果

DOI

書誌事項

タイトル別名
  • FIELD MEASUREMENTS CONCERIUG THE STRESS OF THE SHIELD SEGMENT RINGS IN OPERATION 10 YEARS AFTER CONSTRUCTION

抄録

The second Ueno Tunnel extends for 1, 245 meter with 19 meter overburden on the average, and its outer diameter is 12.66 meter. The tunnel was constructed by hand mining compressed air type method.<BR>During construction, we measured the earth and water. pressure around the tunnel and stress of the shield segment rings.<BR>The instruments to measure these values are still remainded, so we measured them again with the instruments 10 years after construction.<BR>In this paper we explain results of the long term field measurements.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390001205399178496
  • NII論文ID
    130004387119
  • DOI
    10.11532/journalte1991.2.79