Prevention of Blocking of Tremie for Slurry Wall Construction

  • Mizuno Naoya
    中部電力 (株) 土木建築部火力・原子力開発グループ 知多エル・エヌ・ジー (株) 建設部
  • Nagashima Mitsuo
    知多LNG地下式貯槽土木 清水・大林・鹿島・大成共同企業体
  • Makino Soichi
    清水建設 (株) 土木東京支店土木第2部
  • Okada Takeji
    清水建設 (株) 技術研究所

Bibliographic Information

Other Title
  • 地下連続壁トレミーの閉塞防止対策
  • チカ レンゾクヘキ トレミー ノ ヘイソク ボウシ タイサク

Search this article

Description

In constructing a particularly deep slurry wall down to a depth of 120 m by the tremie method, the tremie became blocked with concrete during the casting of one of the elements. This demonstrated a need for clarification of the mechanism of tremie clogging, knowledge of which would enable us to improve methods for the trouble-free construction of deep slurry walls. Of particular relevance is deciding on suitable materials and how to mix them, as well as managing concrete quality control and control of the tremie casting process. We have therefore tested concrete for various characteristics, separated it into components for analysis, measured pressures within the tremie, and carried out pressurization and dehydration tests on concrete to determine the. cause of tremie blocking. Based on our measurements, we have reached important conclusions regarding the selection of high-strength, high-fluidity concrete materials and their mixing, as well as regarding other measures to prevent tremie blocking. In this paper, we identify the mechanism of concrete clogging in a tremie and propose measures to prevent it.

Journal

Citations (3)*help

See more

References(6)*help

See more

Details 詳細情報について

Report a problem

Back to top