Performance Prediction on Progress Control Using a Logistic Cumulative Curve for Plant Construction

Bibliographic Information

Other Title
  • ロジスティック累積曲線を用いたプラント建設の進捗状態推定法
  • ロジスティック ルイセキ キョクセン オ モチイタ プラント ケンセツ ノ シンチョク ジョウタイ スイテイホウ

Search this article

Description

Progress control mostly depends on experience in construction projects because there are many factors which affect progress control and relation between factors is very complex. There is a concern that skilled project managers for plant construction will decrease in the future. It's necessary to clarify the factors and compose a standard control method. In this paper the knowledge of project managers in the area of progress control is clarified and a performance prediction method using their knowledge is presented. The construction model, which has the input of "delivery and construction ability" and the output as "accomplishment, labor and cost, " is presented. The performance prediction method using logistic cumulative curves about "accomplishment, labor and cost" is presented. The decision-making model and algorithm, which describe the performance prediction and performance evaluation, is clarified. As a result, the model and algorithm present the performance prediction method using the relation between planned logistic cumulative curves and actual logistic cumulative curves, and the parameter which describes the progress condition.

Journal

Citations (1)*help

See more

References(13)*help

See more

Details 詳細情報について

Report a problem

Back to top