-
- 中川 一郎
- 日鉄鉱業株式会社釜石鉱業所選鉱課技術係
書誌事項
- タイトル別名
-
- Outlines of Ore Dressing Plant at Kamaishi Mine
- カマイシ コウギョウショ センコウジョウ ノ ガイキョウ
この論文をさがす
抄録
Kamaishi Mine has two kinds of ore dressning plant. One is a magnetic separation plant for iron ore, and the other is a flotation plant for copper ore.<BR>ore. The magnetic separation plant treats a magnetite ore containing 21-25% magnetic iron and has a capacity of 3, 200t per day. The production of the concentrate, which has average grade is 58% iron, is 430, 000 t per year.<BR>The kinds of ores treated at the copper plant are three as follows:<BR>(1) The copper bearing low grade iron ore which has 13-15% magnetic iron and 0.3-0.8 copper.<BR>(2) The mixed ore of chalcopyrite and pyrrhotite which has 7-10% iron and 1.7-2.5% copper.<BR>(3) The wet tailing from magnetic separation plant which has 0.5-0.7% magnetic iron and 0.15-0.2% copper.<BR>Total capacity of the copper plant is 2, 560t per day and it produces the copper concentrate of 17-18% copper and the magnetite concentrate of 57-59% iron.<BR>Average recoveries are about 90% for copper and 90% for magnetic iron.
収録刊行物
-
- 日本鑛業會誌
-
日本鑛業會誌 77 (879), 740-750, 1961
一般社団法人 資源・素材学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390001205981212544
-
- NII論文ID
- 130007254703
- 40018292931
-
- NII書誌ID
- AN00188932
-
- ISSN
- 21856729
- 03694194
-
- NDL書誌ID
- 9158268
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可