常磐磐城西部選炭工場について

  • 清水 忠秋
    常磐炭砿株式会社磐城砿業所砿務部兼選炭課

書誌事項

タイトル別名
  • Iwaki-West Coal Preparation Plant, Joban Colliery
  • トキワ イワキ セイブ センタン コウジョウ ニ ツイテ

この論文をさがす

抄録

Brief description is made in this article on the Iwaki-West coal preparation plant, Joban colliery, Fukushima Prefecture, which was completed in March 1961.<BR>After being sorted by Bradford breaker, 120/28mm run-of-mine coal goes to PIC-Drewboy dense-medium baths (a 2100 main washer and a 115t/h rewasher) using magnetite medium, while 28/0mm raw fines are washed by Baum jigs (a 240t/h main washer and a 120t/h rewasher).Slurries are treated in the circuit which consists of settling tanks, a thickener, and centrifuges.Jig washery refuse is retreated by a verticaltype Drewboy separator (28/8mm) and a densemedium cyclone (8/1mm) to recover low-grade boiler coals.<BR>Automatic control systems relating to dense-medium density and to jig operating variables are shortly mentioned.

収録刊行物

  • 日本鑛業會誌

    日本鑛業會誌 77 (879), 823-827, 1961

    一般社団法人 資源・素材学会