3m以上の厚層一段採掘における移動式組立枠払について

書誌事項

タイトル別名
  • On the Self Advancing Powered Roof Suppart in a Thick Seam over 3 meter
  • 3m イジョウ ノ コウソウ イチダン サイクツ ニ オケル イドウシキ クミタテワクフツ ニ ツイテ

この論文をさがす

抄録

The working face at Miike coal mine have been removed into the thick seam area over 3 meter gradually since 1950-1951. To work this seam throughly, several mining methods were investigated, then the slicing system was applied in Mikawa pit, while self advancing powerd roof support was introduced to Miyaura pit.<BR>It had been generally believed that the working height of long wall face in low dip was up to nearly 2.8 meter, however, after extensive examinations, we had developed the self advancing support using mighty hydraulic props of higher yielding load, there by we have succeed in getting coal seam over 3 meter throughly at same time.

収録刊行物

  • 日本鑛業會誌

    日本鑛業會誌 79 (901), 457-464, 1963

    一般社団法人 資源・素材学会

被引用文献 (1)*注記

もっと見る