3108 Component Commonality Design Method for Switchgears Considering Inventory Level and Delivery Lead-time
-
- KARIYA Haruki
- Kyoto University
-
- IZUI Kazuhiro
- Kyoto University
-
- NISHIWAKI Shinji
- Kyoto University
-
- YOSHIMURA Masataka
- Kyoto University
-
- HAYASHI Shuichi
- Nissin Electric Co. Ltd.
-
- OGIHARA Yoshiya
- Nissin Electric Co. Ltd.
Bibliographic Information
- Other Title
-
- 3108 在庫量と納入リードタイムを考慮した配電盤のコンポーネント共通化設計法(S54 ものづくり設計力の課題と実践,S54 ものづくり設計力の課題と実践)
Description
This paper proposes a new integrated product design method for build-to-order production system based products, using the product family concept, which considers product performance, delivery lead-time and inventory cost. The development and discussion of this method uses a switchgear design problem as a concrete and practical design case. A build-to-order production system has been routinely applied to switchgear manufacturing, due to the requirements of small-scale production scenarios and diverse customer needs. However, if the risk of maintaining unsold inventory can be decreased, manufacturers can justify maintaining certain levels of versatile inventory on hand. In this paper, an inventory production system is applied to the switchgear production problem to shorten the delivery lead-time, and product family design is applied to reduce inventory cost. A three-objective optimization problem is formulated for this problem and a Pareto optimal solution set of the three objective functions is obtained to facilitate appropriate decision-making.
Journal
-
- The proceedings of the JSME annual meeting
-
The proceedings of the JSME annual meeting 2007.4 (0), 189-190, 2007
The Japan Society of Mechanical Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390001206063884928
-
- NII Article ID
- 110007085394
-
- ISSN
- 24331325
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
- OpenAIRE
-
- Abstract License Flag
- Disallowed