病院用エネルギー供給システムの更新計画における初期システムの影響分析

  • 吉田 修
    関西電力(株)研究開発室エネルギー利用技術研究所
  • 吉田 彬
    早稲田大学理工学術院基幹理工学研究科
  • 伊東 弘一
    早稲田大学理工学術院総合研究所
  • 天野 嘉春
    早稲田大学理工学術院総合研究所

書誌事項

タイトル別名
  • Influence of Initial Systems on the Renewal Planning of Energy Supply Systems for a Hospital

抄録

In this study, a renewal planning problem of energy supply system is formulated as a large scale mixed-integer linear programming problem, in which the objective function to the minimized is the average value of annual total cost during system's evaluation period. By adopting the programming language AMPL and CPLEX solver, a numerical study is carried out for a hospital, where electrical(e.g., heat pump) and gas(e.g., gas engine cogeneration) systems are compared together with arbitrary combination one, which is composed of electrical and gas driven pieces of equipment, by focusing particularly on the influence of initial system's difference. The main results obtained are as follows: (a) If the initial system is gas one, it is better to renew it to the electrical one as soon as possible due to relatively low energy efficiency of gas utilizing pieces of equipment, the high price of gas input energy and so on. (b) If the initial system is electrical one, the optimal renewal year becomes relatively later year, because it is economically better to use the initially installed high efficiency system as long as possible. (c) Theoretically, the arbitrary combination system is of course the best renewal one. However, there is no economic difference between the arbitrary combination system and the electrical one.

収録刊行物

参考文献 (1)*注記

もっと見る

関連プロジェクト

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ