書誌事項
- タイトル別名
-
- Mixed-Model Assembly Scheduling by Considering Assembly Times and Part Consumption Ratio in Single Workstation
- タンイツ コウテイ ニ オケル クミタテ ジカン オヨビ ブヒン ショウヒ ワ
この論文をさがす
抄録
Since the goal chasing method (GC) was first proposed to achieve a constant rate of parts usage goal in a mixed-model assembly scheduling problem, many studies have dealt with this problem. In these studies, however, the difference in assembly time among products which affects the scheduled result was not addressed. Consequently, we proposed a time-based goal chasing method (TBGC) in our previous work. In this paper, we present different definitions of the ideal number of parts used which lead to various evaluation measures, addressed and utilized in previous studies. We propose a new method, TBGC+ML, in which assemble time and usage quantities of parts are both considered evaluation measure. Then, through a number of numerical experiments, we show that our two proposed methods are superior to other methods, and discuss their effectiveness when used under different conditions.
収録刊行物
-
- 日本機械学会論文集C編
-
日本機械学会論文集C編 63 (610), 2181-2188, 1997
一般社団法人 日本機械学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390001206328693120
-
- NII論文ID
- 130004232315
- 110006475253
-
- NII書誌ID
- AN00187463
-
- ISSN
- 18848354
- 03875024
- http://id.crossref.org/issn/03875024
-
- NDL書誌ID
- 4237205
-
- 本文言語コード
- ja
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可