Estimation of Weighting Factors for Multi-Objective Scheduling Problems using Input-Output Data

  • Asanuma Kohei
    Graduate School of Engineering Science, Osaka University
  • Nishi Tatsushi
    Graduate School of Natural Science and Technology, Okayama University

Bibliographic Information

Other Title
  • 入出力データを用いた多目的スケジューリング問題の重み係数推定
  • ニュウシュツリョク データ オ モチイタ タモクテキ スケジューリング モンダイ ノ オモミ ケイスウ スイテイ

Search this article

Abstract

<p>Scheduling problems are widely used in recent production systems. In order to model a production scheduling problem more effectively, it is necessary to build a mathematical modeling technique that automatically generates an appropriate schedule instead of an actual human operator. This paper addresses two types of model estimation methods for weighting factors in the multi-objective scheduling problems from input-output data. The one is a machine learning-based method, and the other one is the parameter estimation method based on an inverse optimization. These methods are applied to three-objectives parallel machine scheduling problems, whose objective functions consist of makespan, the weighted sum of completion time, the weighted sum of tardiness, the weighted sum of earliness and tardiness, and setup costs. The accuracy of the proposed machine learning and inverse optimization methods is evaluated. A surrogate model that learns input-output data is proposed to reduce the computational efforts. Computational results show the effectiveness of the proposed method for weighting factors in the objective function from the optimal solutions.</p>

Journal

References(10)*help

See more

Related Projects

See more

Details 詳細情報について

Report a problem

Back to top