- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Knowledge Graph Search feature is available on CiNii Labs
- 【Updated on June 30, 2025】Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
Optimal Scheduling of repair for multiple bridges using an Geometric Brownian Motion Model
-
- NOBATA Tsuyoshi
- Graduate School of Engineering, The University of Tokyo
-
- HONMA Yudai
- Institute of Industrial Science, The University of Tokyo
Bibliographic Information
- Other Title
-
- 幾何ブラウン運動モデルを用いた複数橋梁の改修スケジュール最適化
Search this article
Description
<p>In this study, we propose a new method that apply a degradation process using the geometric Brownian motion process to the bridge maintenance. The merit to introduce the geometric Brownian motion process, we are able to consider the degradation continuously, in contrast to the hazard models using the Markov chain. We formulate the optimal scheduling model which maximizes the whole reliability of multiple bridges by using the probability density function lead from the model. It has a potential to be a guideline of scheduling for bridge inspection and repairing them which priorities are difficult to determine.</p>
Journal
-
- SEISAN KENKYU
-
SEISAN KENKYU 69 (4), 207-210, 2017
Institute of Industrial Science The University of Tokyo
- Tweet
Details 詳細情報について
-
- CRID
- 1390282679037559552
-
- NII Article ID
- 130005872113
-
- NII Book ID
- AN00127075
-
- ISSN
- 18812058
- 0037105X
-
- NDL BIB ID
- 028458673
-
- Text Lang
- en
-
- Data Source
-
- JaLC
- NDL Search
- CiNii Articles
-
- Abstract License Flag
- Disallowed