Evaluation of Fractured Neogene Mudstone for Tunnel Excavation

Bibliographic Information

Other Title
  • 断層活動により破砕した新第三紀泥岩のトンネル掘削における評価法
  • ダンソウ カツドウ ニ ヨリ ハサイ シタ シン ダイサンキ デイガン ノ トンネル クッサク ニ オケル ヒョウカホウ

Search this article

Description

The KITANOMINE tunnel (length : 2,928m) is a long bored tunnel. The north part of the tunnel is surrounded by squeezing mudstone, which became heavily fractured and then changed to clay as the tunnel advanced. The deterioration was so severe that the tunnel convergence and the crown settlement reached a non-negligible level. For safe and reasonable tunnel excavation, accurate evaluation of the ground conditions became more important. This report presents various kinds of new survey, measurement and devised boring method.

Journal

References(3)*help

See more

Details 詳細情報について

Report a problem

Back to top