-
- Ohno Katsuhisa
- Nagoya Institute of Technology
-
- Nakade Koichi
- Department of Systems Engineering Nagoya Institute of Technology
書誌事項
- タイトル別名
-
- Analysis and Optimization of a U-shaped
この論文をさがす
抄録
In the just-in-time context, parts are often processed by a single-unit production and conveyance system (called "ikko nagash" in Japanese) without conveyors. The U-shaped layout, in which each multi-function worker takes charge of several machines, has been introduced as an implementation of this concept. Presently the layout is gaining an increasing popularity due to the low running cost. In this paper, first we deal with the U-shaped production line with a single multi-function worker. We derive his waiting time and a cycle time of the line when processing times of items, operation times, and his walking times between machines are constants. Then we deal with a U-shaped production line with multiple workers. We derive the overall cycle time of this line, and consider an optimal worker allocation problem that minimizes the overall cycle time when the number of workers is given. In particular, it is shown that the U-shaped layout is superior to the linear layout for lines with one or two workers. We also discuss the case where those processing, operation and walking times are stochastic.
収録刊行物
-
- 日本オペレーションズ・リサーチ学会論文誌
-
日本オペレーションズ・リサーチ学会論文誌 40 (1), 90-104, 1997
公益社団法人 日本オペレーションズ・リサーチ学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390282679086245760
-
- NII論文ID
- 110001184481
-
- NII書誌ID
- AA00703935
-
- ISSN
- 21888299
- 04534514
-
- NDL書誌ID
- 4163574
-
- 本文言語コード
- en
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可