- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Knowledge Graph Search feature is available on CiNii Labs
- 【Updated on June 30, 2025】Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
Rationalization of Grouting Work in Rumoi Dam
Bibliographic Information
- Other Title
-
- 留萌ダムにおけるグラウチングの合理化
Search this article
Description
In the Rumoi Dam, based on revision of "Guidelines for Dam Foundation Grouting", the base rock characteristics had been analysed by the results from the permeability test and the grouting under construction. Afterward, grouting was carried out along with proper improvement of grouting specification. This report addresses the consideration of rationalized grouting specification and the verification of grouting results in curtain grouting and blanket grouting of the Rumoi Dam.
Journal
-
- Journal of Japan Society of Dam Engineers
-
Journal of Japan Society of Dam Engineers 23 (1), 27-38, 2013
Japan Society of Dam Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1390282679358382720
-
- NII Article ID
- 130004495233
-
- ISSN
- 18808220
- 09173145
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- CiNii Articles
-
- Abstract License Flag
- Disallowed