- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Knowledge Graph Search feature is available on CiNii Labs
- 【Updated on June 30, 2025】Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
A Multiple Period Problem in Distributed Energy Management Systems Considering CO<sub>2</sub> Emissions
-
- MURODA Yuki
- Graduate School of Engineering, Osaka University
-
- MIYAMOTO Toshiyuki
- Graduate School of Engineering, Osaka University
-
- MORI Kazuyuki
- Advanced Technology R&D Center, Mitsubishi Electric Corporation
-
- KITAMURA Shoichi
- Advanced Technology R&D Center, Mitsubishi Electric Corporation
-
- YAMAMOTO Takaya
- Advanced Technology R&D Center, Mitsubishi Electric Corporation
Bibliographic Information
- Other Title
-
- CO<sub>2</sub>排出量を考慮した分散EMSの多期間問題への拡張
- C02排出量を考慮した分散EMSの多期間問題への拡張
- C02 ハイシュツリョウ オ コウリョ シタ ブンサン EMS ノ タキカン モンダイ エ ノ カクチョウ
- A Multiple Period Problem in Distributed Energy Management Systems Considering CO2 Emissions
Search this article
Description
Consider a special district (group) which is composed of multiple companies (agents), and where each agent responds to an energy demand and has a CO2 emission allowance imposed. A distributed energy management system (DEMS) optimizes energy consumption of a group through energy trading in the group. In this paper, we extended the energy distribution decision and optimal planning problem in DEMSs from a single period problem to a multiple periods one. The extension enabled us to consider more realistic constraints such as demand patterns, the start-up cost, and minimum running/outage times of equipment. At first, we extended the market-oriented programming (MOP) method for deciding energy distribution to the multiple periods problem. The bidding strategy of each agent is formulated by a 0-1 mixed non-linear programming problem. Secondly, we proposed decomposing the problem into a set of single period problems in order to solve it faster. In order to decompose the problem, we proposed a CO2 emission allowance distribution method, called an EP method. We confirmed that the proposed method was able to produce solutions whose group costs were close to lower-bound group costs by computational experiments. In addition, we verified that reduction in computational time was achieved without losing the quality of solutions by using the EP method.
Journal
-
- Transactions of the Society of Instrument and Control Engineers
-
Transactions of the Society of Instrument and Control Engineers 47 (4), 200-208, 2011
The Society of Instrument and Control Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282679481023232
-
- NII Article ID
- 10028213661
-
- NII Book ID
- AN00072392
-
- BIBCODE
- 2011TSICE..47..200M
-
- ISSN
- 18838189
- 04534654
-
- NDL BIB ID
- 11136481
-
- Text Lang
- en
-
- Data Source
-
- JaLC
- NDL Search
- Crossref
- CiNii Articles
- OpenAIRE
-
- Abstract License Flag
- Disallowed