Leveling Standard for Large-sized Paddy Field

Bibliographic Information

Other Title
  • 大区画水田造成のための均平管理基準
  • ダイクカク スイデン ゾウセイ ノ タメ ノ キンペイ カンリ キジュン

Search this article

Abstract

Every farmer customized their consolidated field with leveling works. The load of leveling works is assumed with the amount of transported earth that could be obtained as the product of cutting and banking volume and transport distance. In this paper, the author dealed with the standard land of leveling for large-sized paddy field from the point of earth transportation work.<BR>When current leveling standard for 30 are lot is applied to large-sized paddy field, more load of earth transportation is needed than applying the same standard to 30 are lot. Under the present leveling standard, introducing large-sized paddy field forces the farmers to bear the load of leveling works than present. On the other hand, in state of restricted standard, the builder would bear more load.<BR>Therefore, large-sized paddy field would segment the new leveling standard which is acceptableboth by the farmers population and by the builders.

Journal

Citations (4)*help

See more

References(6)*help

See more

Details 詳細情報について

Report a problem

Back to top