- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Automatic Translation feature is available on CiNii Labs
- Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
Short-cycle Fluctuation Characteristics of Spatial Average Irradiance during Ramp Event
-
- Kato Takeyoshi
- Institute of Materials and Systems for Sustainability, Nagoya University
-
- Manabe Yusuke
- Institute of Materials and Systems for Sustainability, Nagoya University
-
- Funabashi Toshihisa
- Institute of Materials and Systems for Sustainability, Nagoya University
-
- Matsumoto Kazuya
- Dept. of Electrical Eng. and Comp. Sci, Grad. School of Eng, Nagoya University
-
- Kurimoto Muneaki
- Dept. of Electrical Eng. and Comp. Sci, Grad. School of Eng, Nagoya University
-
- Suzuoki Yasuo
- Dept. of Electrical Eng. and Comp. Sci, Grad. School of Eng, Nagoya University
Bibliographic Information
- Other Title
-
- 空間平均日射強度のランプ変動時における短周期変動特性
- クウカン ヘイキン ニッシャ キョウド ノ ランプ ヘンドウジ ニ オケル タンシュウキ ヘンドウ トクセイ
Search this article
Description
Sudden and large changes in renewable energy generators called ramp events are one of the major issues to be addressed for the stable operation of electric power system. By classifying the change of spatial average irradiance in a day, which is the primary factor of aggregated power output of photovoltaic power generation system (PV system), this study statistically evaluated the frequency of ramp events in a year. As a result for the spatial average irradiance in the Chubu area in Japan, the ramp event occurs in 42 days (12%) in a year. The duration of ramp event varies mainly between 30-120min. Then, this study statistically evaluated the short-cycle fluctuation characteristics of spatial average irradiance during ramp event. As a result, in the case of ramp down of relatively large width, the short-cycle fluctuation before and during the ramp event is as large as that in quasi-fine day, while it after the ramp event is small enough as in cloudy day. The results can be useful as approximate evaluation regarding generation flexibility required in electric power system with high penetration PV systems.
Journal
-
- IEEJ Transactions on Power and Energy
-
IEEJ Transactions on Power and Energy 136 (5), 497-504, 2016
The Institute of Electrical Engineers of Japan
- Tweet
Details 詳細情報について
-
- CRID
- 1390282679580066432
-
- NII Article ID
- 130005149203
-
- NII Book ID
- AN10136334
-
- ISSN
- 13488147
- 03854213
-
- NDL BIB ID
- 027349850
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL Search
- Crossref
- CiNii Articles
- OpenAIRE
-
- Abstract License Flag
- Disallowed