A Scheduling Method for Painting Line under Pull Production(<Special Issue>Advanced Production Scheduling)
-
- YOO Jae Kyu
- Faculty of Engineering, Toyohashi University of Technology
-
- SHINBO Kojiro
- Faculty of Engineering, Toyohashi University of Technology
-
- SHIMIZU Yoshiaki
- Faculty of Engineering, Toyohashi University of Technology
書誌事項
- タイトル別名
-
- A Scheduling Method for Painting Line under Pull Production.
- Scheduling Method for Painting Line under Pull Production
この論文をさがす
説明
This paper concerns with a scheduling method for painting (preceding) line with much longer production lead-time than assembly (subsequent) line. In general, production schedule of the painting line is made independently based on the forecasted job requirement at the assembly line. When the job requirement changes at the assembly line by virtue of the change of customer order, therefore, production balance is destroyed between the both lines. To avoid the tardiness caused by such unbalance, we need to have many inventories for the painting line. Such countermeasure is taken place in many companies actually. Thus, to avoid the tardiness while keeping small inventory, we propose a scheduling method that makes a Pseudo-Pull production possible for the painting line. We have evaluated the proposed method through computer simulations.
収録刊行物
-
- JSME International Journal Series C Mechanical Systems, Machine Elements and Manufacturing
-
JSME International Journal Series C Mechanical Systems, Machine Elements and Manufacturing 46 (1), 88-92, 2003
一般社団法人 日本機械学会
- Tweet
キーワード
詳細情報 詳細情報について
-
- CRID
- 1390282679654860544
-
- NII論文ID
- 110004155559
-
- NII書誌ID
- AA11179487
-
- ISSN
- 1347538X
- 13447653
-
- NDL書誌ID
- 6479490
-
- 本文言語コード
- en
-
- 資料種別
- journal article
-
- データソース種別
-
- JaLC
- IRDB
- NDLサーチ
- Crossref
- CiNii Articles
- OpenAIRE
-
- 抄録ライセンスフラグ
- 使用不可