A STUDY OF THE EVALUATION ON BUILDING WORKS : Estimate of ease of working and labor productivity.

  • CHAE soungho
    Advanced Research Institute for Science and Engineering, Waseda Univ.
  • KANO Naruo
    Department of Architecture, Waseda Univ.

Bibliographic Information

Other Title
  • 新工法の開発における作業方法の評価に関する研究 : 作業のし易さと作業時間の評価値について
  • シン コウホウ ノ カイハツ ニ オケル サギョウ ホウホウ ノ ヒョウカ ニ カンスル ケンキュウ サギョウ ノ シ ヤスサ ト サギョウ ジカン ノ ヒョウカチ ニ ツイテ

Search this article

Abstract

This paper discussed on the evaluation of building works with the priorities of decision. Two axis of evaluation were selected for the comparison cease of working and clabor productivity because they share the property of being the most fundamental factors in the building works. The pair-wise comparison with the Analytic Hierarchy Process (AHP) and the Maynard Operation Sequence Technique (MOST) are applied for the estimate of cease of working and clabor productivity. The authors estimated the priorities of the six-alternatives in partition wall works. The differences between the priorities were evaluated, and it was clarified that the method is applicable to the decision in planning work methods.

Journal

References(15)*help

See more

Details 詳細情報について

Report a problem

Back to top