書誌事項
- タイトル別名
-
- Maintenance Planning in Re-entrant Flow Shop (2nd Report)
- リエントラントフローショップ ニ オケル ソウチ メンテナンス ケイカク ニ カンスル ケンキュウ ダイ2ホウ タスタート グリーディホウ ノ テキヨウ ト ジッショウ シケン
- —Application of Multi-start Greedy Method and Verification Test—
- —多スタート・グリーディ法の適用と実証試験—
この論文をさがす
抄録
This paper presents an optimization method for facility maintenance scheduling in re-entrant flow shop using Multi-start and Greedy method. The proposed approach regards maintenances as jobs within limits of starting and finishing time, so that the schedule can realize not only proper maintenance to prevent facility troubles but also high productivity with short scheduling time. A case study is presented for a semiconductor manufacturing system, in which it is difficult to find a proper plan because of complex process flow so that the jobs often re-enter into the facilities. The feasibility of the proposal is discussed comparing to Lagrangian decomposition coordination method in the first; the proposed method can realizes feasible solutions within acceptable calculation speed in real. Also, the feasibility is studied in a real semiconductor manufacturing system and confirmed the proposed method can gain its productivity.
収録刊行物
-
- 精密工学会誌
-
精密工学会誌 76 (12), 1398-1405, 2010
公益社団法人 精密工学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390282679774962432
-
- NII論文ID
- 130000811894
-
- NII書誌ID
- AN1003250X
-
- ISSN
- 1882675X
- 09120289
-
- NDL書誌ID
- 10935785
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可