-
- MIYAZAKI Shigeji
- Okayama University, Faculty of Engineering
-
- OHTA Hiroshi
- University of Osaka Prefecture, Department of Industrial Engineering
Bibliographic Information
- Other Title
-
- フレキシブル組立ラインにおける設備投資案を含むラインバランシング問題
- フレキシブル クミタテ ライン ニ オケル セツビ トウシアン オ フクム ラ
Search this article
Abstract
Pinto et al. (1983) have treated an assembly line balancing with processing alternatives where the choice of manufacturing alternatives and the assignments of work elements are simultaneously determined. Their model, however, is based on the partially-automated assembly line and the processing alternatives can be applied only to the specific work elements. This paper treats a line balancing problem with fully automated and flexible assembly machines to be installed in each station. Some stations, have a decision plan on the choice of the alternative machine with a higher cost but a higher performance. The assignment of work elements and the decisions on the use of alternative machine are simultaneously determined to maximize the profit per unit of time yielded by the line. An algorithm to maximize the profit per unit of time is proposed through the Branch and Bound method.
Journal
-
- Transactions of the Institute of Systems, Control and Information Engineers
-
Transactions of the Institute of Systems, Control and Information Engineers 3 (6), 167-175, 1990
THE INSTITUTE OF SYSTEMS, CONTROL AND INFORMATION ENGINEERS (ISCIE)
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282680142866304
-
- NII Article ID
- 130002036892
-
- NII Book ID
- AN1013280X
-
- ISSN
- 2185811X
- 13425668
-
- NDL BIB ID
- 3660390
-
- Data Source
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed