THE SEDIMENT MOVEMENT DUE TO THE RECONSTRUCTION OF NIKARYOU-SYUKUGAWARA WEIR IN TAMA RIVER
-
- FUKUOKA Shoji
- 広島大学大学院工学研究科社会環境システム専攻
-
- UNNO Syuji
- 国土交通省関東地方整備局京浜河川事務所
-
- NARITA Ichirou
- 国土交通省関東地方整備局京浜河川事務所
-
- TATSUNO Tsuyoshi
- 国土交通省関東地方整備局京浜河川事務所
-
- NISHIMOTO Naoshi
- 日本建設コンサルタント (株) 東京支社
Bibliographic Information
- Other Title
-
- 多摩川ニケ領宿河原堰の改築による堆積土砂の移動
Description
The purpose of this study is to show the effects of the sediment movement due to the weir reconstruction.<BR>Nikaryou-syukugawara weir in Tama River was reconstructed and the weir crest level was dropped about two meters in order to increase the flow sectional area. After the weir completion in 1999, a lot of sediment in the upper reaches of the weir ran off with two floods. It was found through the monitoring data that the flow sectional area in the upper reaches increased due to the sediment run-off. In the lower reaches of the weir, it was found that the harden-silt bed was gradually covered with gravel and that some scour holes were to be shallower. The sediment movement mentioned above is favorable for the river maintenance. A 2D numerical model was applied to the prediction of the sediment movement and it was found that the model is useful.
Journal
-
- PROCEEDINGS OF HYDRAULIC ENGINEERING
-
PROCEEDINGS OF HYDRAULIC ENGINEERING 48 1081-1086, 2004
Japan Society of Civil Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1390282680147160320
-
- NII Article ID
- 130004043483
-
- ISSN
- 18849172
- 09167374
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed