河道の実時間水位予測を用いた遊水地樋門操作

書誌事項

タイトル別名
  • Operating System of Retarding Basin Sluice Ways Using Real-time Stage Prediction

この論文をさがす

説明

A system for operating many sluice ways located along retarding basins using a real-time runoff prediction scheme is developed. In the Ueno Retarding Basins (area: 250ha, pondage: 9.0 million m3) in Japan, there are thirty-six sluice ways andduring a flood at least seventy-two operators must stand by to operate the sluice ways. But it has been very difficult to arrange such many people. In this system, to operate many sluice ways one after another with as few people as possible, the stage of the river at each sluice way is predicted on a real-time basis and the time when the stage rises up to the operation stage at each sluice way is given. For the flood data from September 19 to 20 in 1990, this system was simulated and the time when the stage of the river rised up to the operation stage ofeach sluice ways was predicted and compared to the actual operation time.

収録刊行物

詳細情報 詳細情報について

問題の指摘

ページトップへ