書誌事項
- タイトル別名
-
- DEVELOPMENT OF DRY BRICK MASONRY METHOD(Materials and Construction)
- 乾式煉瓦組積造工法の開発
- カンシキ レンガ ソセキゾウコウホウ ノ カイハツ
この論文をさがす
抄録
It is necessary to examine the foundation, the T type wall, the corner wall, the brick beam, and the connection of floor and interior materials to actually construct it by the SRB-DUP method. In this .study, it was examined that the construction technique and detail of the SRB-DUP brick house to actually construct it. The conclusions are as follows. It was clarified to the SRB-DUP method that an original management technique that was to set up the anchor bolt in the foundation, placed the self leveling, and managed vertical accuracy of the brick wall by using leveling string at the bolt position etc. was necessary.
収録刊行物
-
- 日本建築学会技術報告集
-
日本建築学会技術報告集 11 (22), 25-28, 2005
一般社団法人 日本建築学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390282680149466240
-
- NII論文ID
- 110006348760
-
- NII書誌ID
- AN10531441
-
- ISSN
- 18818188
- 13419463
- http://id.crossref.org/issn/13419463
-
- NDL書誌ID
- 7891125
-
- 本文言語コード
- ja
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可