- 【Updated on May 12, 2025】 Integration of CiNii Dissertations and CiNii Books into CiNii Research
- Trial version of CiNii Research Knowledge Graph Search feature is available on CiNii Labs
- Suspension and deletion of data provided by Nikkei BP
- Regarding the recording of “Research Data” and “Evidence Data”
-
- Uda Takaaki
- 建設省土木研究所河川管理総括
-
- Minamoto Shigeo
- 建設省北陸地方建設局羽越工事事務所
-
- Igarashi Shinji
- 建設省北陸地方建設局羽越工事事務所
-
- Kaki-ichi Katsushige
- 三井共同建設コンサルタント (株)
-
- Omori Shinjiro
- 三井共同建設コンサルタント (株)
Bibliographic Information
- Other Title
-
- 人工リーフを用いた河口処理工の検討-乙大日川の河口を例として-
Search this article
Description
An artificial reef is applied to the river mouth improvement.Numerical simulation of wave, nearshore currents and flood currents were conducted under the condition, in which an artificial reef is installed in front of the mouth in order to reduce wave height in the river and to induce outward currents to enhance scouring in the reef gap so as to be safely used for navigation channel of small fishing boats. As a result of the numerical simulation optimum design of artificial reef as a river mouth improvement was determined.
Journal
-
- PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN
-
PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN 12 439-443, 1996
Japan Society of Civil Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1390282680181437568
-
- NII Article ID
- 130003776074
-
- ISSN
- 18848265
- 09127348
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed