STUDY ON WATERTIGHTNESS OF RC SEGMENT FOR UNDERGROUND RIVER SHIELD TUNNEL

Bibliographic Information

Other Title
  • 大きな内水圧を受けるシールドトンネルの設計法に関する一考察

Abstract

  In case of the underground flood way constructing by Shield driven Tunnelling Method with RC segment, the watertightness of the RC segment against inner water pressure had not been studied well, regarding the validity of the conventional crack width calculation formula and the relationship between the crack width and the leak water. In this paper, new formula is proposed and the relationship is exhibited by means of full-size RC-segment loading tests and leak water tests. As a result, the maximum interval of the cracks should be used the interval of the assembly steel bars, and the crack width of about 0.1mm is not leakable in long term, are shown.

Journal

Citations (1)*help

See more

References(2)*help

See more

Details 詳細情報について

  • CRID
    1390282680231939200
  • NII Article ID
    130004943273
  • DOI
    10.2208/jscejf.66.578
  • ISSN
    18806074
  • Text Lang
    ja
  • Data Source
    • JaLC
    • Crossref
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top